- Sichuan ROAD & BRIDGE (GROUP) Corporation Ltd. - Ningpan Expressway Tunnel Section 16
- Posted Time:2024-07-15Source:UGHMViews:Share:
- Construction Time
July 2023
- Construction Site
Ningpan Section 16, Hongge Town, Yanbian County, Panzhihua
- Project Type
Traffic tunnel
- Equipment Type
Rock drilling rig
Project Introduction: Located in the ZCB1-15/16 project section of the Ningpan section of the Yanjiang Expressway, it is the exit end of the volcanic tunnel. The total investment is about 31.1 billion yuan. The right line is 3,675 meters long, and the left line is 3,660 meters long. It is an important pilot project of the "Research and Development Center of Automated Operation Technology in the Transportation Industry" of the Ministry of Transport and a strategic project of Shudao Group to implement "intelligent construction". The left line of the volcanic tunnel is 7,145m long, and the right line is 7,192m long. The tunnel has a complex geological structure with rock bursts, karst caves, fault fracture zones, and other adverse geological conditions.