DYK Project in Bangda, Tibet
Posted Time:2024-07-15Source:UGHMViews:Share:
  • Construction Time

    June 2022

  • Construction Site

    Bangda Airport, Tibet

  • Project Type

    Special application

  • Equipment Type

    Rock drilling rig

Project Introduction: Located at a high altitude, it is extremely cold. The temperature in winter is below zero. Located in a remote area, it has high requirements for equipment and material equipment. The air at the construction site is thin, the surrounding rock structure of the entire tunnel group is good, and there are many random supports on site.