Ciwu Mining
Posted Time:2024-07-15Source:UGHMViews:Share:
  • Construction Time

  • Construction Site

    Shangrao, Jiangxi

  • Project Type

    Underground mine

  • Equipment Type

    Anchor car

Project Introduction: Applied in Ciwu Mining in Shangrao, with ore hardness of F9-F11 and developed joints in some areas.

Construction Efficiency: Single-hole drilling depth of 20-30m, average pure drilling speed of 1.8m/min per hole, average rod changing time of 10-20s per rod.